Riverside Clinic, Phase 2

head_seq 42 · 36 live items · 42 changes in the log

Open 21

punch
Chipped sill, Level 2 west wing
Crew A seq 35
punch
Grout haze, Level 1 lobby
Crew B seq 33
punch
Door rubs frame, Loading dock
Crew A seq 32
punch
Missing cover plate, Unit 204
Crew B seq 31
punch
Scuffed paint, Level 1 lobby
Crew A seq 30
punch
Cracked tile, Mech room B1
Crew A seq 29
punch
Uneven threshold, Stair 2
Crew A seq 28
punch
Chipped sill, Mech room B1
Crew A seq 27
punch
Loose handrail, Level 1 lobby
Crew B seq 26
punch
Grout haze, Level 2 east wing
Crew B seq 25
punch
Door rubs frame, Level 1 lobby
Crew B seq 24
punch
Missing cover plate, Unit 204
Crew B seq 23
punch
Scuffed paint, Corridor C
Crew A seq 22
punch
Cracked tile, Mech room B1
Crew B seq 21
task
Seal penetrations, Loading dock
Crew A normal seq 19
task
Rough-in plumbing, Mech room B1
Crew B normal seq 16
task
Install hangers, Unit 311
Crew B low seq 15
task
Set door frame, Stair 2
Crew B low seq 14
task
Hang drywall, Level 2 east wing
Crew A normal seq 11
task
Paint second coat, Loading dock
Crew A low seq 10
task
Mount fixtures, Corridor C
Crew B normal seq 8

In progress 4

task
Rough-in plumbing, Level 2 west wing
Crew B normal seq 42
task
Set door frame, Corridor C
Crew A low seq 40
task
Tape and mud, Loading dock
Crew B low seq 38
task
Pull wire to panel, Unit 311
Crew B high seq 13

Done 9

task
Install hangers, Stair 2
Crew A low seq 41
task
Pull wire to panel, Level 1 lobby
Crew A normal seq 39
task
Hang drywall, Stair 2
Crew A low seq 37
task
Paint second coat, Roof
Crew A normal seq 20
task
Mount fixtures, Loading dock
Crew A high seq 18
task
Pour curb, Level 2 west wing
Crew A low seq 17
task
Tape and mud, Roof
Crew A normal seq 12
task
Seal penetrations, Unit 204
Crew B high seq 9
task
Pour curb, Level 2 east wing
Crew A low seq 7

Closed 2

punch
Uneven threshold, Level 2 west wing
Crew A seq 36
punch
Loose handrail, Unit 311
Crew B seq 34